StacksVerified U.S. regulatory reference

50 CFR Figure 27 to Part 679

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov

Note: The location for measurement of maximum line material cross section does not include any devices or braided or doubled material used for section termination.

[75 FR 61651, Oct. 6, 2010]